Stucco Time.
At this point, the house has been wrapped with building paper and lath, and the appplication of stucco has begun. The finished pre-cast moldings are first anchored in place, and the grey scratch coat of plaster is trowelled on. The finish stucco color will be applied later.
Front elevation with precast and stucco scratch coat. Tile is loaded on the roof |
Front driveway court |
Front driveway court from right side. The driveway leads down the right side into the basement garage. |
Rear elevation. The landscape work to the right is a large pool (more about that later) |
precast arches and balcony at front elevation. |
Close-up of precast entry portico. |
Detail of precast moorish arch and decorative panel. |
This is part of the colonnade visible during framing in previous post, #7. The steel posts will be covered with precast columns. |
Variation on a theme: the loggia outside the library is composed by alternating sizes of arches. |
The interior is progressing also, and is now starting to show elements of the final design:
Coffered arched ceiling in the master bedroom. |
The theme of the moorish arched is continued on the interior. |
Coffered ceiling in living room. |
View of rear yard from second floor balcony; the pool is taking shape, and the view is already wonderful. |