Saturday, October 17, 2009

House on the Coast, Post #3


The concrete for the basement retaining walls was poured last week, and when I stopped by the site on Saturday, they had nearly finished stripping the formwork. The notches at the top of the walls are locations where landscape paving meets inset door thresholds; the cantilevered projections on the left side are locations of fireplaces.

It rained a moderate amount last week, but you can't tell by looking at the ground here. We are back into 90-degree weather, and things dry out rapidly. Despite the general aridity, a layer of fog, known as a marine layer, which is common along the coast in the morning, is visible covering the ocean surface in the background.

The next major operation will be setting structural steel, before framing begins.