Saturday, September 6, 2014

House in Chino Hills: Progress

Framing is continuing - the trusses were set last week, and they are sheathing the roof.

  Cliquez pour voir en grand:

The usual view from the front: the roof planes are now apparent, and framing of the two cupolas has started. arches on the front entry portico are nearly complete.

A view perpendicular to the front door from a lower angle.

The view from the front door through the house; still a lot going on and it's difficult to see the rooms and ceilings, but the view is nice.

View from the master bedroom (south), through the rear loggia and out to the valley.

View north toward the rear of the house: master bedroom at left, living room in center, nook and family room at right.

View across the rear of the house; arches for the loggias are framed.

View west through the rear loggias. The nook protrudes out into the covered area.

No comments:

Post a Comment